Power Your Drive for
State Parks and Beaches

EV Charging Infrastructure Program

In a continued effort to reduce greenhouse gas emissions (GHGs) and air pollution, SDG&E® has adopted a new program that will bring 74 EV chargers installed at approximately 12 sites. The two types of chargers that will be installed include: Level 2 (208-240 volt) chargers that can provide up to 10-20 miles of range per hour of charging and DC fast chargers (480 volt) that can provide about 50-60 miles per hour of charging. These chargers will accommodate existing EV drivers and encourage EV adoption.

Beaches

The program is fully subscribed. We are no longer accepting applications.

Program Highlights 

Public Charging Option

  • To serve charging needs of the general public

No Cost Installation of EV Charging Infrastructure & EVSE

Versatile Site Design

  • A variety of available site configurations allows for site host flexibility including L2 and DC Fast Charging

EV Pricing Plan

  • Site host or drivers will be billed on existing SDG&E time-of-use EV rate, allowing them to save money with off-peak charging

SDG&E Ownership of EVSE

  • SDG&E will own, maintain and operate the EVSE

Program Eligibility Requirements

  • Must be a state park or beach

  • Sites located in disadvantaged community (DAC) are preferred, but not required

  • Agree to enroll in eligible Time-of-Use (TOU) pricing plan

  • Operate & maintain charging equipment for at least 8 years

  • Site must include an appropriate location to deploy the charging equipment in a cost-effective manner

  • Must provide charging data for at least 5 years

  • Own or lease property where chargers are to be installed or be the customer of record associated with meter

  • Provide an easement, if required

  • Agree to program terms & conditions

Interested in participating?

Contact us at CTprograms@sdge.com.   To learn more about the assembly bills, check out the links below.